Slickline Production Restoration — Enageed Resource Limited
Scope
Slickline well intervention programme to restore production on a shut-in well for Enageed Resource Limited. Scope included gauge run, plug retrieval, gas lift valve replacement and wellbore cleanout.
Challenge
The well had been shut in due to downhole obstructions and gas lift system failure. Enageed required rapid mobilisation and technically competent execution to restore production within a constrained operational window.
Delivery
GEM coordinated slickline units, toolstrings and specialist personnel for Enageed's offshore asset. The well was successfully intervened within the planned operational window with no unplanned downtime.
Outcomes
- Production restored on the targeted well
- Gas lift system reinstated
- Plug retrieval completed without fishing requirement
- Programme executed within planned operational window
Well InterventionSlicklineGas LiftProduction Restoration
03Wellhead & Pressure Control
2026Wellhead Integrity Programme — Onshore Asset
Onshore operator, Nigeria
Scope
Wellhead inspection, pressure testing and maintenance programme across a portfolio of producing and suspended wells. Included Christmas tree servicing, valve replacement and leak-off testing.
Challenge
The operator's wellhead fleet had not been systematically inspected or pressure-tested in several years. Regulatory compliance and asset integrity were both at risk.
Delivery
GEM deployed a wellhead integrity team with OEM-backed tooling and test equipment. A structured inspection and remediation programme was executed across the full well portfolio.
Outcomes
- Full portfolio inspected and documented
- Pressure integrity confirmed on all producing wells
- Non-conforming valves and seals replaced
- Regulatory compliance restored across asset
WellheadPressure ControlAsset IntegrityCompliance
OCTG & Workover Consumables Supply — Amni International Petroleum
Amni International Petroleum Development Company
Scope
Supply of OCTG (casing and tubing), workover tools, drill bits, drilling chemicals and rig consumables for Amni International's multi-well programme. Full OEM traceability and mill certification provided on all materials.
Challenge
Amni International required a reliable supply partner with OEM traceability and the ability to consolidate multiple product categories — OCTG, workover consumables and rig supplies — under a single procurement interface to support a tight drilling schedule.
Delivery
GEM managed sourcing, quality verification, documentation and in-country logistics for all product categories. All materials were delivered to Amni's rig site on schedule with full mill certification and OEM documentation packages.
Outcomes
- All materials delivered on schedule to rig site
- Full OEM traceability and mill certification provided
- Single procurement interface reduced Amni's coordination burden
- No supply-related rig downtime recorded across the programme
ProcurementOCTGWorkover ConsumablesSupply Chain
Coiled Tubing Intervention — OML 18 Limited Production Enhancement
Scope
Coiled tubing intervention for scale removal, perforation washing and acid stimulation on a portfolio of underperforming production wells for OML 18 Limited.
Challenge
Scale accumulation and near-wellbore damage had significantly reduced production rates across several OML 18 Limited wells. The operator required a technically capable intervention partner with coiled tubing access and stimulation chemistry expertise.
Delivery
GEM coordinated coiled tubing units, BHA assemblies and stimulation chemistry for OML 18 Limited's onshore asset. The programme was executed safely with all wells returning to target production rates ahead of schedule.
Outcomes
- Production rates restored to target on all wells
- Scale removal and acid stimulation completed safely
- No wellbore integrity issues during or after operations
- Programme completed ahead of planned schedule
Well InterventionCoiled TubingStimulationProduction Enhancement
E-line & Workover Planning — Oando Energy Resources
Scope
E-line logging, technical review and workover programme planning for a portfolio of mature producing wells operated by Oando Energy Resources. Scope included well performance analysis, e-line log interpretation, intervention candidate selection, programme design and cost estimation.
Challenge
Oando required an integrated technical partner to conduct e-line operations and translate log data into actionable workover programmes for a backlog of intervention candidates across a mature asset.
Delivery
GEM provided a dedicated well engineering and e-line team to execute logging operations, interpret results, rank workover candidates by production uplift potential and develop detailed programmes for the priority wells.
Outcomes
- E-line logging completed across full candidate portfolio
- Workover programmes developed for priority wells based on log data
- AFE estimates prepared for Oando's budget submission
- Integrated e-line and engineering delivery reduced programme timeline
EngineeringE-lineWell EngineeringWorkover